Exercise 1: Minimizing Z = 2x + 4y

Understanding the Objective Function and Constraints

In this first exercise, our goal is to minimize the objective function Z = 2x + 4y. Think of this as trying to reduce a cost or minimize resource usage. But, we can't just make x and y infinitely small! We have constraints that limit our options. These constraints are inequalities that define a feasible region – the set of all possible (x, y) values that satisfy the conditions. Let's break down these constraints:

  • x + y ≥ 8: This constraint tells us that the sum of x and y must be greater than or equal to 8. Imagine this as a minimum requirement for a combined resource. For example, the combination of labor hours (x) and machine hours (y) used in production must add up to a minimum of 8 hours to meet production goals.
  • 3x + y ≤ 6: This inequality indicates an upper limit. The combination of 3 times x plus y must be less than or equal to 6. This might represent a constraint on the availability of a certain input material. Let's say x represents the amount of raw material A, and y represents the amount of raw material B. This constraint would mean that we have a limited stock of these materials, where 3 units of material A plus 1 unit of material B can't exceed a total of 6 units due to storage limitations or budget constraints.
  • 4x + 3y ≤ 12: Another upper limit! Four times x plus 3 times y must be less than or equal to 12. Similar to the previous constraint, this could be due to a limit on resources, storage space, or even manpower. For example, x could be the number of workers on one task, and y the number on another. This constraint might represent the maximum availability of resources needed for these tasks. Think of it as the overall workload these workers can handle within a given timeframe.
  • x, y ≥ 0: These are our non-negativity constraints. We can't have negative values for x and y! This makes perfect sense in most real-world scenarios, as we can't use a negative amount of resources or produce a negative number of items. These constraints ensure our solutions are physically and logically possible.

Graphing the Constraints and Finding the Feasible Region

The next step is to visualize these constraints. We'll graph each inequality on a coordinate plane. Each inequality represents a line, and the feasible region is the area where all the inequalities are satisfied simultaneously. To graph these, we convert each inequality into an equation, plot the line, and then determine which side of the line represents the solution to the inequality.

  1. Convert Inequalities to Equations:
    • x + y = 8
    • 3x + y = 6
    • 4x + 3y = 12
    • x = 0 (y-axis)
    • y = 0 (x-axis)
  2. Plot the Lines: For each equation, find two points (x, y) that satisfy the equation and draw a line through them. For example, for x + y = 8, we can choose the points (0, 8) and (8, 0).
  3. Determine the Feasible Region: For each inequality, test a point (like (0, 0) if it's not on the line) to see if it satisfies the inequality. If it does, shade the side of the line containing that point. If not, shade the other side. The area where all shaded regions overlap is the feasible region.

In our case, after graphing, you'll notice the feasible region is an unbounded area. This means it extends infinitely in some direction.

Identifying Corner Points

The corner points (also known as vertices) of the feasible region are crucial. These are the points where the constraint lines intersect. We need to find the coordinates of these points because the optimal solution (minimum or maximum Z) will always occur at one of these corners. In this case, the corner points are typically found by solving the systems of equations formed by the intersecting lines. These points will play a critical role in determining the solution that minimizes our objective function.

For this exercise, you'll likely find the following corner points:

  • Intersection of x + y = 8 and y = 0: (8, 0)
  • Intersection of x + y = 8 and 3x + y = 6: This intersection results in a negative value for y, meaning it's outside our feasible region and not a corner point.
  • Intersection of 3x + y = 6 and 4x + 3y = 12: (6/5, 12/5)
  • Intersection of 4x + 3y = 12 and x = 0: (0,4)
  • Intersection of 3x + y = 6 and x = 0: (0,6)

Evaluating the Objective Function at Corner Points

Now, we'll plug the coordinates of each corner point into our objective function, Z = 2x + 4y, and calculate the value of Z. This step will tell us which corner point yields the minimum value for Z.

  • At (8, 0): Z = 2(8) + 4(0) = 16
  • At (6/5, 12/5): Z = 2(6/5) + 4(12/5) = 60/5 = 12
  • At (0, 4): Z = 2(0) + 4(4) = 16
  • At (0,6): Z = 2(0) + 4(6) = 24

Determining the Solution Type

After evaluating the objective function, we observe that the minimum value of Z is 12, which occurs at the point (6/5, 12/5). However, because the feasible region is unbounded, we need to consider if Z can become infinitely small. In this case, as x approaches zero and y becomes larger, Z will decrease to the value of 16. Therefore, the point (6/5, 12/5) does not represent a point of minimum value. The unbounded feasible region implies that Z can decrease indefinitely, making this an unbounded solution.

Exercise 2: Maximizing Z = 1.5x + 2.5y

Setting the Stage: Objective Function and Constraints

Alright, let's switch gears! In this exercise, we're aiming to maximize Z = 1.5x + 2.5y. This could represent maximizing profit or output. Again, we have constraints that define the boundaries of our decision-making space. Here are the constraints:

  • 2x + y ≥ 120: This means the combination of 2 times x and y must be at least 120. This constraint sets a minimum threshold. For example, if x represents the number of units of Product A and y represents the number of units of Product B, this constraint might specify the minimum combined production level to meet market demand or to maintain a certain level of operational efficiency. We can't go below this minimum, because it would cause inventory shortages or fail to meet contractual obligations.
  • x + 5y ≥ 250: Similarly, the sum of x and 5 times y must be greater than or equal to 250. This inequality places another minimum requirement on the mix of x and y. Think of it as another production requirement or a minimum standard for service delivery. For instance, in a healthcare setting, this constraint might represent the minimum amount of care services (represented by x and y) that must be provided to meet regulatory standards or patient needs. Compliance with this minimum ensures that the organization is meeting its operational and ethical obligations.
  • x + 2y ≤ 200: This is an upper limit – the sum of x and 2 times y must be less than or equal to 200. This constraint introduces a limitation. For example, this limitation might be due to the limited availability of labor hours, raw materials, or machine capacity. In manufacturing, this could mean a constraint on the number of products that can be completed within a set timeframe due to the equipment available or the workforce's working hours. Therefore, the operations manager must ensure that production planning is within these limitations to prevent operational bottlenecks and inefficiencies.
  • x, y ≥ 0: Our familiar non-negativity constraints. We can't have negative values for x and y – it wouldn't make sense in most practical situations.

Graphing and Visualizing the Feasible Region

As we did before, let's graph these constraints to see our feasible region. This visual representation will help us understand the set of all possible solutions that comply with our constraints.

  1. Convert Inequalities to Equations:
    • 2x + y = 120
    • x + 5y = 250
    • x + 2y = 200
    • x = 0
    • y = 0
  2. Plot the Lines: Find two points for each equation and draw the lines.
  3. Determine the Feasible Region: Shade the regions that satisfy each inequality. The overlapping region is our feasible area. For example, the point (0, 0) can be used as a test point in each inequality. For 2x + y ≥ 120, substituting (0, 0) gives 0 ≥ 120, which is false. Therefore, the feasible region is on the other side of the line from (0, 0). For x + 5y ≥ 250, similarly, (0, 0) gives 0 ≥ 250, which is also false, indicating that the feasible region is on the other side of the line. However, for x + 2y ≤ 200, (0, 0) gives 0 ≤ 200, which is true, so the feasible region is on the side of the line that contains (0, 0). These steps help to define the feasible region clearly.

In this case, you'll find the feasible region is a polygon formed by the intersections of these lines.

Pinpointing the Corner Points

Corner points are where the action happens! They're the points where constraint lines intersect, and they're our candidates for the optimal solution. To find these points, we solve the systems of equations formed by the intersecting lines. These solutions represent the corner points of our feasible region, which are crucial in determining the optimal solution for our linear programming problem.

The corner points for this exercise are:

  • Intersection of 2x + y = 120 and x = 0: (0, 120)
  • Intersection of 2x + y = 120 and x + 2y = 200: (40, 40)
  • Intersection of x + 2y = 200 and x + 5y = 250: (100, 50)
  • Intersection of x + 5y = 250 and y = 0: (250, 0)
  • Intersection of 2x + y = 120 and y = 0: (60, 0)

Evaluating the Objective Function

Let's plug those corner points into our objective function, Z = 1.5x + 2.5y, and see which one gives us the highest value of Z.

  • At (0, 120): Z = 1.5(0) + 2.5(120) = 300
  • At (40, 40): Z = 1.5(40) + 2.5(40) = 160
  • At (100, 50): Z = 1.5(100) + 2.5(50) = 275
  • At (250, 0): Z = 1.5(250) + 2.5(0) = 375
  • At (60, 0): Z = 1.5(60) + 2.5(0) = 90

Identifying the Solution Type

We see that the maximum value of Z is 375, which occurs at the point (250, 0). Since our feasible region is bounded (it's a closed polygon), we have a unique optimal solution. This means there's one specific combination of x and y that maximizes our objective function.

Conclusion

So, there you have it! We've worked through two linear programming exercises, identified the feasible regions, found the corner points, and determined the solution types. In the first exercise, we encountered an unbounded solution, meaning the objective function could decrease indefinitely. In the second exercise, we found a unique optimal solution, indicating a specific point that maximizes our objective. Understanding these concepts is crucial for applying linear programming to real-world problems, whether it's optimizing production, resource allocation, or any other scenario where you need to make the best decision within constraints.